Tuesday, August 28, 2007

Officially Back to School Mode......

Only one more week before school start. Here are the list that need to be accomplish before school start...... I will come back and check off things at the end of each day. If i didn't get to finish the assignment it will be push to next day. Hopefully i won't need to push it. As well i will be posting progress everyday for this week. So its gonna be a long week.....wish me luck :D

08/28 Tuesday
1. Independent Study Proposal [CHECK 08/29]
2. Email Anezka regarding about the proposal and meeting of signing the independent study contract [CHECK 08/29]
3. Back to thesis, rough sketch of the product. At least have 5 different design.[CHECK 08/28]
4. If have extra time, work on the beginning sequence of the demo reels. [Nope, no time 08/28]

08/29 Wednesday
1. Continuing with sketching out the product (2 to 3 different sketches) [CHECK 08/30]
2. Making rough product model in Maya 3D (Make at least 3 different model in 3D) [Half Check,got one done so far, going to build more 09/02]
3. Starting a storyboard of the story for the product [going to start working on it 09/02]
4. If having extra time, work on the demo reels [donno if i have time, working on it]

08/30 Thursday
1. Concept and think of some of ideas of the product (have at least 3 different point of the products but more will be great!!!) [CHECK 09/02]
2. Continuing with storyboard for the product (try to come up 2 or 3 different types of story to sell those selling point) [still not having time to work on it 09/02]
3. Narrow down with the rough model and make it detail. [got a rough one right now, going to wait until the critic ]
4. If having extra time, work on the demo reels. [donno if i have time, working on it]

08/31 Friday
1. Stating out the point of the products for now. [donno if i have time, working on it]
2. Elevator pitch of the whole thesis. [donno if i have time, working on it]
3. Finish up with the storyboard. (should be needing 3 at the end) [donno if i have time, working on it]
4. Working on the demo reels [donno if i have time, working on it]
5. Empty Spots in case if needed

09/01 Saturday
1. Continuing with the storyboard if its not finish.
2. Start to build up the model for the set for the storyboard.
3. Work on the demo reels.
4. Empty Spots

09/02 Sunday
1. Continuing working on building up the set
2. Finishing up with demo reels, email them out or burn them and mail them out
3. Empty Spots

09/03 Monday
1. Continuing with finishing up with demo reels if its not finish. and as well continuing with mailing them out.
2. Empty Spots

wow after list all these stuff, i really wonder if i can do it. Hopefully i can....hopefully.....